Tai Hoe Resources Sdn. Bhd

Projects

Proposed Construction of Landfill Gas Collection

Phase 3 in Bukit Tagar Sanitary Landfill

Pipe Laying & Welding

Pipe Laying & Welding

Laying Pipe at Slope Phase 2B

Project Info

  • Supply and install 315mm diameter double flanged butterfly valve with streering  wheel at booster station (GBS) for isolating

To supply and install add HDPE 315mm x 250mm dia. T junctions

    1. Well No. 3 – 15

                     2. Well No. 3 – 18

Laying Pipe at Slope Phase 2B

  • Connection of proposed 315mm dia. HDPE pipe to existing Gas Booster Station inclusive of cutting, welding, short piece and any other necessary works.